Project | Client | Description | Completion |
---|---|---|---|
Feasibility Study & detailed design of new 4- lane express way starting from Korai on Indus highway N-55 (Km 930+00) traversing through different towns crossing Indus river at Kala Bagh( Mianwali) connecting Pindigeb Fatehjang and terminating at Bahtar Ba | NHA |
|
2016 |
Traffic Improvement at Marrir Chowk through addition of Two Lanes on either side of Murree Road under Railway Bridge, Rawalpindi | Rawalpindi Development Authority (RDA) | Rawalpindi Development Authority (RDA) intended to Improve the Traffic at Marrir Chowk through Addition of Two Lanes on Either Side of Murre Road under Railway Bridge, Rawalpindi" on a very fast track basis at cost of Rs. 429.500 – Mllion under Annual Development Programme (ADP) 2011-12 8 2012-13. The Murree Road is passing through the heart of the city and connects with Islamabad on one side and cantonment on the other end. The road is hub of commercial activities in the city. The road is the busiest one in the city and traffic congestion problems are experienced ever since. The project includes construction of 2 additional lanes on either side of Murree Road under Railway Bridge at Marrir Chowk and subsequently construction of widened Railway bridge of two span s (82feet each) Steel Bridge. Overall objectives of the project were:
|
2014 |
Detailed Design Review and Construction Supervision of Improvement and Widening of Chakdara – Mingora –Fatehpur Section of National Highway N-95 (82 Km). | National Highway Authority (NHA) |
|
2019 |
Detailed Design of Construction of Rajanpur – D.G Khan Section as 4-Lane Highway and Dualization and Rehabilitation of D.G Khan – D.I Khan Section of N-55 (237 Km) | National Highway Authority (NHA) |
|
2018 |